<!-- last-reviewed: 2026-06-04 · owner: Personal Assistant -->
Session Close & Next-Session Handoff — 2026-06-04
By the Personal Assistant. GR-6 close for the session that built the Agent Auditor (Phase-1 + Phase-2 foundation), ran the first full audit cycle (5 agents), and shipped all pipeline improvements from external review feedback. UTC day 2026-06-04. Next session: start here.
1. What this session accomplished
A focused AI systems + quality infrastructure session. Eight PRs merged to
main; the audit pipeline is now end-to-end validated and CI-gated.
| PR | What | State |
|---|---|---|
| #88 | Agent Auditor Phase-1 + GitHub hygiene — agent-auditor agent spec, CI gate, audit SOP wired in. | Merged |
| #75 | Archive register mode (C1) — scripts/archive-manifest.sh register command for one-pass new-document registration. |
Merged |
| #89 | Auditor v0.2 tiering policy + historian T2 upskill — tiering policy encoded in auditor spec; historian upskilled to T2. | Merged |
| #90 | Structured audit→review→training_plan pipeline (Phase-2 foundation) — 3-stage pipeline end-to-end, E2E validated (36/36 gates). | Merged |
| #91 | Auditor-gate yaml import guard (permanent fix) — CI gate hardened against yaml import errors; permanent, not a workaround. | Merged |
| #92 | Training_plan parser fix (pipeline_handoff priority) — parser now correctly extracts pipeline_handoff priority field. |
Merged |
| #93 | Batch-2 audit cycle (4 agents) — second batch of agents audited through the pipeline. | Merged |
| #94 | Auditor_notes schema wiring (in CI) — auditor_notes field wired into the audit schema and CI gate. |
Merged |
Key decisions captured this session (GR-6)
- Mentor gate discipline absorbed into Confidant — the Mentor’s Standard Flow gate methodology (idea seed → ideate → optimize → approve) is preserved in the Confidant repository, not lost with the offboarding.
- Audit pipeline architecture — 3-stage pipeline (audit → review → training_plan) is the canonical form; Phase-2 design deferred until 360 peer solicitation tools are ready.
- Tiering policy (v0.2) — auditor now enforces T1/T2/T3 tier assignments based on conformance profile; tiering is an output of the audit, not an input.
- archivist P0 items — two items gate the archivist’s T1 upskill: (1) TOOLSPEC.md (22 tools, no ACI documentation), (2) milestone definitions before eval. Both are outstanding and owner-assigned for next session.
2. Final state (verified at close)
main: at commitaa21699(batch-2 audit cycle, PR #93). PR #94 (auditor_notes schema wiring) in CI at time of session close.- Audit program: Cycle 1 complete — 5 agents through the pipeline. All pre-canon non-conformant as expected (baseline established).
- Pipeline integrity: 36/36 E2E gates passing (validated in PR #90).
- Confidant: Mentor gate discipline recorded; project board updated this session.
3. Open items for next session
P0 — gates downstream work
- archivist T1 upskill — two items outstanding before eval:
- TOOLSPEC.md: 22 tools documented with no ACI (Agent Capability Index) entries — must be filled before T1 certification.
- Milestone definitions: archivist’s milestone rubric must be defined before the T1 gate eval can run.
- auditor_notes in real audits — prompt v0.3 fix is in PR #94 (merged /
in CI); verify that
auditor_notespopulates correctly in the next audit run.
P1 — ready to drive
- Phase-2 design — 360 peer solicitation tools (when ready); design the peer-review stage of the audit pipeline.
- KLMS main set as GitHub default branch — open item from the founding session; KLMS repo still has the wrong default branch set in GitHub.
Standing items (carry-forward)
- Confidant records sync — project board updated this session; keep in sync as audit cycles run.
- Business-model direction — monetize vs. AI-for-good (CGEO keystone);
unblocks audience/revenue/brand-voice layer. Decision brief at
reports/2026-06-02-business-model-decision-brief.md. Still the top open Principal decision. - R-001 close-out — Slack credential rotation (SOP-102) + set
CRON_SECRET+SLACK_OAUTH_TOKENin the intranet Vercel project.
4. Audit program status
| Metric | Value |
|---|---|
| Cycle | 1 (complete) |
| Agents audited | 5 |
| Pre-canon conformance | All non-conformant (expected baseline) |
| Pipeline stages | 3 (audit → review → training_plan) |
| E2E gate score | 36/36 |
| Highest-priority upskill | archivist (T1, 2 P0 items outstanding) |
| Artifacts on main | All |
Next cycle begins when P0 items are resolved.
5. Standing facts for the next session
- Audit pipeline is 3-stage and CI-gated. Entry:
agent-auditorruns the audit; output flows toreviewstage; thentraining_planis generated. All three stages are E2E validated. - Tiering policy v0.2 is in the auditor spec. Tier assignment is an audit output derived from the conformance profile — not manually assigned.
- Confidant holds the Mentor’s gate discipline (Standard Flow methodology). Check the Confidant project board for current status.
- Archive discipline: GR-8 — refresh
latest/+ MANIFEST in the same commit;verifyis authoritative. - Merge discipline: GR-7 — batch merges to checkpoint; never merge
mid-task. A
mainmerge is the only deploy-triggering event. - Org: 41 agents across 21 units + PA (unchanged this session).
Session closed: audit Cycle 1 complete, pipeline 36/36, 8 PRs merged, GR-6 complete. Next session can open straight into §3 (P0 items).