Skip to content

Session Close & Next-Session Handoff — 2026-06-04

Guide

<!-- last-reviewed: 2026-06-04 · owner: Personal Assistant -->

Session Close & Next-Session Handoff — 2026-06-04

By the Personal Assistant. GR-6 close for the session that built the Agent Auditor (Phase-1 + Phase-2 foundation), ran the first full audit cycle (5 agents), and shipped all pipeline improvements from external review feedback. UTC day 2026-06-04. Next session: start here.


1. What this session accomplished

A focused AI systems + quality infrastructure session. Eight PRs merged to main; the audit pipeline is now end-to-end validated and CI-gated.

PR What State
#88 Agent Auditor Phase-1 + GitHub hygiene — agent-auditor agent spec, CI gate, audit SOP wired in. Merged
#75 Archive register mode (C1) — scripts/archive-manifest.sh register command for one-pass new-document registration. Merged
#89 Auditor v0.2 tiering policy + historian T2 upskill — tiering policy encoded in auditor spec; historian upskilled to T2. Merged
#90 Structured audit→review→training_plan pipeline (Phase-2 foundation) — 3-stage pipeline end-to-end, E2E validated (36/36 gates). Merged
#91 Auditor-gate yaml import guard (permanent fix) — CI gate hardened against yaml import errors; permanent, not a workaround. Merged
#92 Training_plan parser fix (pipeline_handoff priority) — parser now correctly extracts pipeline_handoff priority field. Merged
#93 Batch-2 audit cycle (4 agents) — second batch of agents audited through the pipeline. Merged
#94 Auditor_notes schema wiring (in CI) — auditor_notes field wired into the audit schema and CI gate. Merged

Key decisions captured this session (GR-6)

  • Mentor gate discipline absorbed into Confidant — the Mentor’s Standard Flow gate methodology (idea seed → ideate → optimize → approve) is preserved in the Confidant repository, not lost with the offboarding.
  • Audit pipeline architecture — 3-stage pipeline (audit → review → training_plan) is the canonical form; Phase-2 design deferred until 360 peer solicitation tools are ready.
  • Tiering policy (v0.2) — auditor now enforces T1/T2/T3 tier assignments based on conformance profile; tiering is an output of the audit, not an input.
  • archivist P0 items — two items gate the archivist’s T1 upskill: (1) TOOLSPEC.md (22 tools, no ACI documentation), (2) milestone definitions before eval. Both are outstanding and owner-assigned for next session.

2. Final state (verified at close)

  • main: at commit aa21699 (batch-2 audit cycle, PR #93). PR #94 (auditor_notes schema wiring) in CI at time of session close.
  • Audit program: Cycle 1 complete — 5 agents through the pipeline. All pre-canon non-conformant as expected (baseline established).
  • Pipeline integrity: 36/36 E2E gates passing (validated in PR #90).
  • Confidant: Mentor gate discipline recorded; project board updated this session.

3. Open items for next session

P0 — gates downstream work

  1. archivist T1 upskill — two items outstanding before eval:
    • TOOLSPEC.md: 22 tools documented with no ACI (Agent Capability Index) entries — must be filled before T1 certification.
    • Milestone definitions: archivist’s milestone rubric must be defined before the T1 gate eval can run.
  2. auditor_notes in real audits — prompt v0.3 fix is in PR #94 (merged / in CI); verify that auditor_notes populates correctly in the next audit run.

P1 — ready to drive

  1. Phase-2 design — 360 peer solicitation tools (when ready); design the peer-review stage of the audit pipeline.
  2. KLMS main set as GitHub default branch — open item from the founding session; KLMS repo still has the wrong default branch set in GitHub.

Standing items (carry-forward)

  1. Confidant records sync — project board updated this session; keep in sync as audit cycles run.
  2. Business-model direction — monetize vs. AI-for-good (CGEO keystone); unblocks audience/revenue/brand-voice layer. Decision brief at reports/2026-06-02-business-model-decision-brief.md. Still the top open Principal decision.
  3. R-001 close-out — Slack credential rotation (SOP-102) + set CRON_SECRET + SLACK_OAUTH_TOKEN in the intranet Vercel project.

4. Audit program status

Metric Value
Cycle 1 (complete)
Agents audited 5
Pre-canon conformance All non-conformant (expected baseline)
Pipeline stages 3 (audit → review → training_plan)
E2E gate score 36/36
Highest-priority upskill archivist (T1, 2 P0 items outstanding)
Artifacts on main All

Next cycle begins when P0 items are resolved.

5. Standing facts for the next session

  • Audit pipeline is 3-stage and CI-gated. Entry: agent-auditor runs the audit; output flows to review stage; then training_plan is generated. All three stages are E2E validated.
  • Tiering policy v0.2 is in the auditor spec. Tier assignment is an audit output derived from the conformance profile — not manually assigned.
  • Confidant holds the Mentor’s gate discipline (Standard Flow methodology). Check the Confidant project board for current status.
  • Archive discipline: GR-8 — refresh latest/ + MANIFEST in the same commit; verify is authoritative.
  • Merge discipline: GR-7 — batch merges to checkpoint; never merge mid-task. A main merge is the only deploy-triggering event.
  • Org: 41 agents across 21 units + PA (unchanged this session).

Session closed: audit Cycle 1 complete, pipeline 36/36, 8 PRs merged, GR-6 complete. Next session can open straight into §3 (P0 items).