SOP-069 — Write & accept acceptance criteria (the product definition of done)
SOP · owner: Product (Product Manager). Layer: SOP/Runbook (
docs/canon.md). Defines the product feature “definition of done” — distinct from the document DoD (SOP-002). No story enters an Engineering sprint without acceptance criteria signed off here. Links to canon; does not restate it.
Interface Contract
- Inputs: draft user story ← from self (SOP-068) · trigger:
draft complete - Inputs: research findings ← from <Design Research Director> · trigger:
research findings issued - Inputs: four-test verdict ← from <Quality & Risk> · trigger:
review passed - Outputs: acceptance-criteria-complete story → to Engineering Director · trigger:
story set accepted - Outputs: acceptance criteria for independent review → to Quality & Risk · trigger:
review requested - Handoff trigger (in): a user story is drafted (SOP-068 step 3) and needs acceptance criteria before it can enter a sprint
- Handoff trigger (out): the story’s acceptance criteria are complete and testable — the story is now sprint-eligible and joins the story set handed to Engineering
- Definition of Done before handoff:
- [ ] criteria cover the happy path
- [ ] criteria cover the primary edge cases
- [ ] criteria state the explicit non-goals (what this story does NOT include)
- [ ] each criterion is testable — Engineering can judge pass/fail without a judgment call
- [ ] no technical approach is prescribed (Engineering owns how)
- [ ] criteria trace to the story’s source (provenance carried from SOP-068)
- [ ] where evidence is insufficient to define “done”, the gap is flagged to Design Research, not guessed
- [ ] learnings captured to
docs/knowledge/if any (SOP-024)
Trigger status:
research findings issued,story set accepted, anddraft completeare now registered (docs/handoff-triggers.md, Wave-2 block);review requested/review passedalready existed. Thestory set accepted → Engineering Directoredge is absorbed by the Director’sstory set acceptedfan-in sink (SOP-054, §3.1 R1); the Design-Research and Quality & Risk edges are pending (those roles are not Interface-Contract identities here — §3.1.1 R3).
Purpose
Turn a user story into something Engineering can build and objectively call done. Acceptance criteria are the contract: they remove judgment calls from “is this finished?” so the Engineering Director never has to guess intent.
When to use
- Immediately after a user story is drafted (SOP-068 step 3) — before it can be RICE scored into a sprint-eligible state.
- When new research findings (
research findings issued) change what “done” means for an existing story.
Flow
flowchart LR
A["Draft story<br/>(from SOP-068)"] --> B["Write happy-path<br/>Given/When/Then"]
B --> C["Write primary<br/>edge cases"]
C --> D["State explicit<br/>non-goals"]
D --> E{"Enough evidence<br/>to define 'done'?"}
E -->|no| F["Flag gap to<br/>Design Research"]
E -->|yes| G["Self-check vs<br/>quality bar"]
G --> H["Story sprint-eligible<br/>→ story set (SOP-068)"]
classDef s fill:#1d4ed8,color:#fff,stroke:#1e3a8a
classDef d fill:#0f766e,color:#fff,stroke:#134e4a
class A,B,C,D,F,G,H s
class E d
Text fallback: take the drafted story → write happy-path criteria in Given / When / Then → write the primary edge cases → state the explicit non-goals → check there is enough evidence to define “done”; if not, flag the gap to Design Research (do not guess) → self-check against the quality bar → the story is sprint-eligible and joins the story set (SOP-068).
Steps
- Anchor to the story. Restate the
As a… I want… so that…so the criteria are judged against the intended benefit, not a drifted one. - Happy path. Write
Given <context>, When <action>, Then <observable outcome>for the primary success scenario. Outcomes must be observable (a state, a rendered element, a recorded value) — not internal implementation. - Primary edge cases. Enumerate the realistic failure / boundary scenarios the story must handle (empty state, missing input, unauthorised access, the broadcast/ fan-out case, etc.). One Given/When/Then each.
- Explicit non-goals. State what this story does not include — the scope
fence that stops Engineering over-building and stops the story sprawling. “This
story does not cover
<X>; that is<other story / out of scope>.” - Testability check. For each criterion ask: could Engineering judge pass/fail without asking me? If no, rewrite until yes. Vague criteria (“works well”, “is fast”) are defects — give the observable condition or the number.
- Implementation-agnostic check. Strip any how. “Renders within 200ms” is a what (acceptable as a measurable outcome); “uses a Redis cache” is a how (delete — Engineering’s call). A prescribed technical approach is a defect.
- Evidence check. If you cannot define “done” because the research evidence is
insufficient (e.g. no usability finding on the threshold), flag it to Design
Research (
research findings issuedis the inbound trigger) rather than invent a criterion. - Optional independent review. For high-stakes stories, hand the criteria to
Quality & Risk (
review requested) for the four-test sample; incorporatereview passedfeedback. - Mark sprint-eligible. The story now carries complete criteria and rejoins the backlog (SOP-068) for RICE scoring and sprint assembly.
Acceptance-criteria block format (lives with the story in docs/product/backlog.md)
Story: As a <user>, I want <what>, so that <why>.
Source: <concept brief / research finding / Principal directive>
Acceptance criteria:
Happy path:
- Given <…>, When <…>, Then <observable outcome>.
Edge cases:
- Given <…>, When <…>, Then <observable outcome>.
Non-goals:
- This story does NOT include <…>.
Roles / approvers
- Product Manager — sole author and acceptor of acceptance criteria.
- Design Research Director — supplies the evidence that defines “done”; receives flagged gaps where evidence is insufficient.
- Engineering Director — the consumer; judges done/not-done against the criteria; raises ambiguity back as an implementation risk.
- Quality & Risk — optional independent four-test review for high-stakes stories.
Guardrails
- No story leaves without criteria — this SOP is the gate (charter rule 1).
- No technical approach in criteria — Engineering owns how (boundary 1).
- No guessing “done” — insufficient evidence is flagged to Design Research, not filled with an invented criterion (charter rule 2).
- Observable outcomes only — a criterion a stranger cannot test is a defect (master-plan §1.3 test 1).
- Personal information is PA-only.
See also: docs/units/product/charter.md (quality bar) · SOP-068 (backlog) ·
SOP-070 (roadmap) · docs/sop/change-management.md (SOP-002 — the document DoD this
is distinct from) · interface-contract-spec.md · docs/handoff-triggers.md.