SOP-068 — Backlog management (intake → story → RICE → groom → sprint story set)
SOP · owner: Product (Product Manager). Layer: SOP/Runbook (
docs/canon.md). The requirement interface between upstream strategy (Innovation / Design Research / CPTO) and downstream Engineering. Links to canon; does not restate it.
Interface Contract
- Inputs: accepted concept brief ← from <Innovation Director / CPTO> · trigger:
gate package ready - Inputs: research findings ← from <Design Research Director> · trigger:
research findings issued - Inputs: implementation risk against a story ← from <Engineering> · trigger:
implementation risk raised - Outputs: sprint story set → to Engineering Director · trigger:
story set accepted - Outputs: prioritised ready backlog → to Project Manager · trigger:
backlog ready - Outputs: approved backlog snapshot / RICE scorecard → to Archivist · trigger:
artifact approved - Outputs:
docs/product/canon Index row change → to Documentarian · trigger:document changed - Handoff trigger (in): an Innovation concept brief is accepted at the Ideate→Plan gate, OR Design Research issues findings, OR Engineering raises a risk against an existing story
- Handoff trigger (out): a sprint’s story set is accepted (acceptance-criteria-complete) and handed to Engineering; the prioritised backlog is handed to the Project Manager to sequence
- Definition of Done before handoff:
- [ ] every story in the set is well-formed (
As a <specific user>, I want <what>, so that <why>) - [ ] every story carries complete, testable acceptance criteria (SOP-069) — no story without criteria
- [ ] every story names its source (provenance); none written from air
- [ ] every story is independently deliverable (single increment; oversized stories split)
- [ ] RICE scored; priority order recorded with input reasoning
- [ ] major priority shifts (delaying committed work) carry written CPTO sign-off
- [ ] no technical approach prescribed in any acceptance criterion (Engineering owns how)
- [ ] learnings captured to
docs/knowledge/if any (reported for indexing, SOP-024)
- [ ] every story in the set is well-formed (
Trigger status:
research findings issued,story set accepted, andbacklog readyare now registered (docs/handoff-triggers.md, Wave-2 block, Operations-approved 2026-06-01). The Ideate→Plan concept handoff uses the canonicalgate package ready(the variantconcept brief acceptedwas folded into it — reuse-beats-add).requirements issued(Legal→Engineering) is a distinct event, sostory set acceptedis kept separate. Theimplementation riskinput declares a placeholder producer (<Engineering>) — a fan-in sink (§3.1 R1); the Innovation / Design-Research producer edges are pending (those Directors are not Interface-Contract identities here — §3.1.1 R3).
Purpose
Maintain a single, prioritised product backlog so each sprint begins with a defined, accepted set of stories Engineering can build from — never from raw concept briefs. This is the gate that keeps requirements and implementation in different hands.
When to use
- An Innovation concept brief is accepted at the Ideate→Plan gate (
concept brief accepted). - Design Research issues findings that change or refine requirements (
research findings issued). - Engineering raises a risk/dependency against a story (
implementation risk raised). - Continuously, for grooming — backlog management is not a one-time event.
- At sprint start, to assemble and hand off the sprint story set.
Flow
flowchart LR
A["Receive upstream input<br/>(read in full)"] --> B{"Gap / ambiguity<br/>/ silent on user?"}
B -->|yes| R["Raise to originator<br/>(do NOT invent scope)"]
B -->|no| C["Write user stories<br/>(value increments)"]
C --> D["Write acceptance criteria<br/>(SOP-069)"]
D --> E["RICE score<br/>+ record reasoning"]
E --> F{"Major priority shift<br/>delaying committed work?"}
F -->|yes| G["CPTO sign-off<br/>(written)"]
F -->|no| H["Groom backlog<br/>(split / retire / update)"]
G --> H
H --> I["Assemble sprint story set<br/>→ Engineering 'story set accepted'"]
I --> J["Hand backlog → PMO 'backlog ready'<br/>+ archive 'artifact approved'"]
classDef s fill:#1d4ed8,color:#fff,stroke:#1e3a8a
classDef d fill:#0f766e,color:#fff,stroke:#134e4a
class A,R,C,D,E,H,G,I,J s
class B,F d
Text fallback: receive and read the upstream input in full → check for gaps; if
ambiguous, underspecified, or silent on the user, raise it to the originator and
stop (no scope invention) → write user stories (one value increment each) →
write acceptance criteria (SOP-069) → RICE score and record the input
reasoning → if a major priority shift delays committed work, get written CPTO
sign-off → groom (split oversized stories, retire stale ones, update on new
evidence) → assemble the sprint story set and hand to Engineering (story set accepted) → hand the prioritised backlog to the Project Manager (backlog ready)
and approved snapshots/scorecards to the Archivist (artifact approved).
Steps
- Receive & read. Open the upstream source in full. Do not paraphrase a concept brief — surface its exact hypothesis, riskiest assumption, and recommended scope as the basis for stories.
- Identify gaps before writing. If the brief/finding is ambiguous, underspecified, or silent on who the user is, raise it back to the originating agent (Innovation / Design Research) and pause story-writing for the affected scope. Never invent scope to fill a gap.
- Write user stories. One or more per feature, form
As a <specific user type>, I want <what>, so that <benefit>. Each independently deliverable, scoped to a single value increment. Name a specific user — “as a user” is a defect. - Write acceptance criteria per SOP-069 (Given / When / Then + non-goals). No story leaves this step without criteria.
- RICE score. For each candidate, record Reach, Impact, Confidence, Effort and
the reasoning behind each input. Compute
RICE = (R × I × C) / E. The resulting order is the backlog priority. Use the scorecard template (§ below). - Check for a major priority shift. If the new order delays previously committed work, prepare a brief rationale and obtain written CPTO sign-off before committing the new order or communicating it downstream.
- Groom. Split stories too large for one sprint; retire items no longer relevant; update stories when new research evidence arrives. Continuous, not one-time.
- Assemble the sprint story set. At sprint start, produce the ordered list of
accepted, acceptance-criteria-complete stories. Hand to the Engineering Director
(
story set accepted); notify the Project Manager the input is ready (backlog ready). Do not negotiate scope with Engineering at sprint start — priority is set before sprint planning begins. - Update the roadmap (SOP-070) after major prioritisation decisions or gate approvals.
- Capture & archive. File any learning to
docs/knowledge/(report for indexing, SOP-024); hand approved snapshots and RICE scorecards to the Archivist (artifact approved).
RICE scorecard format (record in docs/product/backlog.md or a sibling scorecard)
| Story | Reach | Impact | Confidence | Effort | RICE | Reasoning (per input — falsifiable) |
|---|---|---|---|---|---|---|
<story> |
<#/period> |
<0.25–3> |
<%> |
<person-units> |
(R×I×C)/E |
<why these numbers — cite the brief/finding> |
Roles / approvers
- Product Manager — authors stories, acceptance criteria, RICE scores; owns the backlog; assembles the sprint story set; the only agent who writes and accepts stories.
- CPTO — signs off major priority shifts; reviews at the Ideate→Plan / Plan→Build gates. (Direct reporting line; not a registry handoff edge.)
- Innovation Director / Design Research Director — originate the upstream inputs; resolve gaps raised back to them.
- Engineering Director — downstream consumer of the sprint story set; raises implementation risks back.
- Project Manager (PMO) — sequences the ready backlog into milestones (delivery sequencing is theirs, not ours).
Guardrails
- No story without acceptance criteria (charter Operating rule 1).
- No scope invention — raise gaps, do not assume (rule 2).
- No technical approach in acceptance criteria — Engineering owns how (boundary 1).
- Evidence over preference — RICE + upstream evidence drive priority; not enthusiasm (rule 4).
- CPTO sign-off on major priority shifts before downstream comms (rule 5).
- Delivery sequencing belongs to the Project Manager — we hand a ready backlog; we do not set milestones or timelines.
- Personal information is PA-only — never accessed here.
- Links to policy:
hr/employee-handbook.md,hr/policies/*; rulesCLAUDE.md.
See also: docs/units/product/charter.md · SOP-069 (acceptance criteria) ·
SOP-070 (roadmap) · docs/methodology.md (Ideate→Plan gate) ·
interface-contract-spec.md · docs/handoff-triggers.md.