<!-- last-reviewed: 2026-06-01 · owner: Personal Assistant -->
Session Close & Next-Session Handoff — 2026-06-01
By the Personal Assistant. The graceful close of the session that built the Org-Wide Documentation & Knowledge Program end-to-end, and the launchpad for the next session. Next session: start here.
1. What this session accomplished
Began as “Hi Pa” and became the full delivery of the Org-Wide Documentation & Knowledge Program (Phase 0 → G3), plus a candid evaluation of it.
Merged to main (6 PRs):
| PR | What | Gate |
|---|---|---|
| #43 | Program approval + Wave 0 plumbing (the reconciliation gate) | G0 |
| #44 | Wave 1 — governance cluster | G1 |
| #45 | GR-4 amendment + GR-8 + Finance threshold/track-first | — |
| #46 | Wave 2 — CPTO cluster | G2 |
| #47 | Waves 3+4 — COO+CGEO + org-wide convergence (Phase 1, 41/41) | G2 |
| #48 | Phase 2 close — coherence + Q&R + COO G3 sign-off | G3 — COMPLETE |
Open (draft, green CI):
| PR | What |
|---|---|
| #49 | Program evaluation (3 C-suite memos + PE consolidated roadmap) + this handoff |
2. Final state (verified at close)
- Program: COMPLETE — 41/41 agents documented; ~190 artifacts (22 unit charters
- 3 cluster operating-models, role manuals, 101 SOPs each with an Interface Contract, job aids, playbooks, a risk register, glossary/canon refresh).
- Gates green: Handoff Register
GREEN — 403 edges, 0 defects(3 ADR-0006-gated pending);km-indexGREEN 7/7;schema-driftGREEN; archiveverify433 OK, 0 drift, 0 missing. - Working tree: clean; all branches pushed.
- The green is real — the program caught two hollow-greens (the 47-seam identity gap; the C-1 parse-drop) and hardened the gate (malformed-edge guard).
3. Decisions captured this session (GR-6 — all durable)
- Program approved (conditions-first); charter approval delegated to C-suite heads.
- GR-4 amended (AI-workforce headcount) + GR-8 added (protect the archive record) —
CLAUDE.md. - Finance: spend-materiality threshold (<$50 one-time / <$20-mo → auto) + track-first budget —
docs/financial-system.md,finance/*.csv. - Roster freeze LIFTED at close (its “until Phase 2 closes” condition is met) — see
hr/policies/roster-freeze.md. - The C-suite + Process-Engineer evaluation roadmap (
reports/2026-06-01-program-evaluation-and-recommendations.md).
4. Carry-forward backlog (next-session “on deck”, prioritized)
Principal decisions (these gate downstream work)
- Business-model direction — monetize the channel vs. AI-for-good pipeline (
docs/concept.mdleaves it open). CGEO calls this the keystone that unblocks the entire audience / revenue / brand-voice layer. - OI-5 — commission the External Review of the Q&R unit (the anti-theater instrument can’t certify itself; External Review Partners is on retainer).
- PR #49 — merge to bank the evaluation roadmap (green draft).
P0 machinery fixes (Process-Engineer-led; mostly small; ready to drive)
- Wire AR-003 — the cadence heartbeat (reconcile + KM + staleness on a
schedule:trigger). The keystone — nothing stays true without it. - Producer-presence CI complement — close the fan-in blind-spot (R-003 / OI-4).
- Validate reconciler
IDENTITIESagainstORG.md— a roster role with no pattern = build error (root of the 47-seam blind-spot). - File/cross-link existence check — a NEW blind-spot class: a doc citing a missing file should fail the gate (CGEO finding).
Live risk
- H2 / R-001 — Slack ToS code fix (
intranet/src/pages/api/slack/events.ts:303-305). The one live external exposure; posture documented (SOP-083), deletion cron disabled, but the code fix is owed by Engineering.
Completeness gaps (P1/P2 — see the roadmap for the full list)
- Create thin real
docs/brand/+ flywheel-model headers (un-breaks 21 citations). - GR-1 enforcement:
docs/ai/model-selection.md+ eval harness (AI Systems). - Threat models (
docs/security/threat-models/);docs/legal/; SOP-001–005 filename normalization; the R12 throughput model; one-commandarchive-register+program-statustooling.
5. Standing facts for the next session
- Org: 41 agents across 21 units + PA; ORG.md “Operating rules” now point at the new unit charters.
- The integrity gates run in CI (
.github/workflows/ci.yml):archive-manifest.sh verify,handoff-reconcile.mjs,km-index-check.mjs,check-schema-drift.mjs— all green onmain. - Where things live: program corpus under
docs/units/**+docs/sop/; the program plan + tracker underdocs/documentation-program/; the roadmap + sign-offs underreports/. - Push discipline: GR-7 — batch to checkpoints (each push deploys Vercel; daily budget per ADR-0009).
- Archive discipline: GR-8 — refresh
latest/+ MANIFEST in the same commit;verifyis authoritative; neverupdate/refreshto mass-rewrite.
Session closed clean: tree clean, pushed, all gates green, archive 0 drift. Next session can open straight into §4.