<!-- last-reviewed: 2026-06-01 · owner: Innovation (Innovation Director) -->
SOP-044 — Ideate→Plan handoff (gate package)
SOP · owner: Innovation (Innovation Director). Layer: SOP/Runbook (
docs/canon.md). The gate criteria live indocs/methodology.md(§Ideate, §Plan, §Phase gates) and the concept-brief shape indocs/units/innovation/charter.md— not restated here. This is the unit’s one required SOP (artifact-matrix §3 ✓): the recurring procedure that turns a de-risked bet into a structured handoff package for the Ideate→Plan gate.
Interface Contract
- Inputs: commissioned intel brief ← from Competitive Intelligence Analyst · trigger:
intel brief delivered - Inputs: seam resolution (pursue / research-pass / drop) ← from CPTO · trigger:
review passed - Inputs: concept-de-risk evidence ← from Design Research Director · trigger:
gate evidence ready - Inputs: field-feedback brief (at-risk patterns worth a product change) ← from <Customer Success> · trigger:
field-feedback routed - Outputs: intelligence commission → to Competitive Intelligence Analyst · trigger:
intelligence commissioned - Outputs: hypothesis / strategic bet (seam) → to CPTO · trigger:
review requested - Outputs: concept to de-risk → to Design Research Director · trigger:
de-risk commissioned - Outputs: Ideate→Plan gate package → to CPTO · trigger:
gate package ready - Outputs: proven concept brief → to Project Manager · trigger:
gate package ready - Outputs: gate package + experiment record → to Archivist · trigger:
artifact approved - Handoff trigger (in): an ideation spec / direct chat / CPTO assignment opens a bet, or the CIA returns a commissioned brief
- Handoff trigger (out): a de-risked concept brief is packaged and handed to the CPTO for the gate and to the Project Manager for sequencing
- Definition of Done before handoff:
- [ ] Riskiest assumption named and falsifiable (not “validate the concept”)
- [ ] Lean test run; method · sample · signal · decision rule · result recorded
- [ ] Recommendation stated (pursue / pivot / drop) with the steelman objection surfaced
- [ ] Open questions for Design Research listed (the iterative generate↔evaluate seam)
- [ ] Concept brief follows the charter shape (problem · hypothesis · riskiest assumption · test+result · recommendation · open questions)
- [ ] No raw intel forwarded as a strategic option (synthesized first)
- [ ] Learnings captured to
docs/knowledge/if the bet surfaced one - [ ] Package handed to the Archivist (0 drift)
Registered triggers (
docs/handoff-triggers.md, Wave-2 block, Operations-approved 2026-06-01):gate package ready(the canonical Ideate→Plan concept handoff — Innovation Director → CPTO / Project Manager / Product),intelligence commissioned(Innovation Director → CIA),intel brief delivered(CIA → Innovation Director);review requested/artifact approvedalready existed. The CPTO / Project Manager / CIA counterparties are not Interface-Contract identities here, so those edges reconcile aspending (counterparty not yet authored)perinterface-contract-spec.md§3.1.1 R3 — clean for this wave.
Purpose
Package a de-risked strategic bet into a structured, falsifiable concept brief and hand it across the Ideate→Plan gate to the CPTO (gate approval) and the Project Manager (delivery sequencing) — so the org commits to a direction on evidence, with the riskiest assumption named and a real signal in hand, never on a narrative.
When to use
Whenever a bet has been generated, framed as a hypothesis, and de-risked with a lean test, and the Innovation Director judges it ready to recommend for Plan. Also when the CPTO returns a gate decision on a previously handed package (accept → to Delivery; pivot → back into Ideate; drop → close the bet).
Flow
flowchart LR
A["Bet de-risked<br/>(lean test run)"] --> B{"Brief complete<br/>per charter shape?"}
B -->|no| F["Fill gaps:<br/>riskiest assumption,<br/>result, steelman"]
B -->|yes| C["Package the<br/>gate brief"]
F --> C
C --> D["Hand to CPTO<br/>(gate) + PM (sequencing)"]
D --> E{"CPTO gate<br/>decision"}
E -->|pursue| P["→ Delivery<br/>sequencing"]
E -->|pivot| I["→ back into<br/>Ideate"]
E -->|drop| X["Close the bet,<br/>capture the learning"]
C --> AR["→ Archivist"]
classDef s fill:#1d4ed8,color:#fff,stroke:#1e3a8a
classDef d fill:#0f766e,color:#fff,stroke:#134e4a
class A,F,C,D,P,I,X,AR s
class B,E d
Text fallback: a bet is de-risked → is the concept brief complete against the charter shape? (no → fill the gaps: name the riskiest assumption, record the test result, surface the steelman; yes → package it) → hand the package to the CPTO for the gate and to the Project Manager for sequencing, and to the Archivist for preservation → the CPTO returns a gate decision: pursue (→ Delivery sequencing), pivot (→ back into Ideate), or drop (close the bet, capture the learning).
Steps
- Confirm the bet is de-risked — the riskiest assumption is named and a lean test has produced a real signal against it. If not, return to the generative work (manual §How it works); do not package an untested bet.
- Assemble the concept brief to the charter shape: problem · hypothesis · riskiest assumption · lean test (method · sample · signal · decision rule) + result · recommendation (pursue/pivot/drop) · open questions for Design Research.
- Surface the steelman — state the strongest objection to the recommendation, not just the case for it. A recommendation with no acknowledged downside is incomplete.
- List the open evaluative questions for the Design Research Director — the generate↔evaluate seam is iterative; name what Innovation could not answer and is handing across.
- Hand the package to the CPTO (
gate package ready) for the gate decision and to the Project Manager (gate package ready) for sequencing. Hand the package and the experiment record to the Archivist (artifact approved). - Act on the gate decision — pursue → the Project Manager sequences (Innovation does not set the sequence); pivot → re-enter Ideate with the new riskiest assumption; drop → close the bet and capture why.
- Capture the learning — record any durable pattern or dead end to
docs/knowledge/(KM cadence); link it from the brief.
Roles / approvers
Run by the Innovation Director. The CPTO owns the Ideate gate decision and is the approving authority for advancing to Plan; the Principal owns Ideate gate reviews directly per the JD and may review. The Project Manager owns sequencing once a concept is approved — the Innovation Director hands the brief and does not set milestones. The Competitive Intelligence Analyst supplies commissioned intel (SOP-045) when landscape context is needed.
Guardrails
- Evidence over enthusiasm — no package without a named, falsifiable riskiest assumption and a real lean-test signal. A narrative is not a tested hypothesis.
- Synthesize, never forward — raw competitive intelligence is turned into options before it reaches the gate; never hand a CIA brief to the gate as-is.
- Lean by default — the smallest experiment that yields a real signal is the right one; do not recommend an engineering spend to test a safe assumption.
- Stay in lane — do not conduct evaluative research (Design Research), set the delivery sequence (Project Manager), write code/architecture (Engineering), or edit foundational docs (Documentarian). Hand across the seam; do not cross it.
- Surface disagreement in writing — if the CPTO’s direction conflicts with the evidence, say so explicitly (GR-3); silent compliance is a violation.
- Never touch the Principal’s personal information — PA-only.
- Do not restate the gate criteria or the concept-brief shape — link to
docs/methodology.mdand the charter.
Job aid: JA-044-gate-package-checklist.md.
See also: SOP-045 (intel monitoring) · docs/units/innovation/charter.md ·
docs/methodology.md · docs/handoff-triggers.md.